Manufacturing process of artificial formwork

Manufacturing process of artificial formwork
1. Raw material cutting:
The raw materials are cut according to the original incoming ayer. The raw  is cut according to the fixed layer thickness  flat  rotary cutting, and the  layer with the same  example is cut according to the size  of the template, and the magazine on the  layer surface  is removed. The magazine can affect the bonding fastness of the later adhesive.
2. Drying treatment:
The  layer after cutting and rotary cutting contains  more  points. Therefore, for  large-scale  production, we need to enter  drying  treatment through  material drying  machine. The ⽊ layer after drying  is brittle. Therefore, we need to keep it for 2-3 days to ensure the toughness of  layer. In a small number of cases, we can take the sun into the sun for treatment.
3. Gluing and laminating treatment:
The building formwork formed by stretching is made of multi-layer  plates  glued  and bonded in  by  gluing  type. A special glue roller is set to pass the  plate through the glue filling machine, and the front and back of the plate will be evenly coated with glue layer. The  plate coated with glue layer will be placed on the⾯ template on the surface of the formwork  and evenly spread 9-11 layers (as required).
4. Hot pressing processing:
The formwork layer laid by gluing shall be flattened by hot pressing. In the traditional heating, the boiler is used for heat transfer and heating, and the modern equipment room is used for electric heating. After flattening, the compactness of the building formwork can be increased, the molding is more regular, and the quality of the formwork is improved. Adopt the technology of pre pressing first and then hot pressing to minimize the dislocation rate of blank plate, and then apply reasonable pressing and temperature hot pressing to ensure that each building formwork has excellent bonding strength and hardness.
5. Painting, trimming and packaging treatment:
After hot pressing treatment, there will be a small amount of dislocation and irregular edges of the inner  plates of the building formwork. The excess plates will be cut and sprayed with anti-corrosion paint. The anti-corrosion paint is an important factor to ensure the service life and storage time of the building formwork. The building formwork has the advantages of light weight, bearing heavy load, making the bottle convenient, the surface smooth, anti-corrosion and so on.